Поделиться:





2.What's the advantages in Aluminum Formwork?
1.Environmental Protection.
2.Low using cost.
3.Saving labor & Easy installation.
4.Fast speed of construction.
5.Recycling 300 times.
6. High stability and load bearing capacity.
7. Safety & convenience.
8. Recovery of high value.
9. Strong versatility.
10. Precision design & compact joint.
3.Introduction of Aluminum Formwork System
| Material | 6061-T6 Aluminum alloy |
| Main Components | Wall |
| Beam | |
| Column | |
| Prop | |
| Others | |
| Applications | Exhibition setup |
| Interior refurbishing | |
| All the towers can be connected together for multi-purpose | |
| Yield strength | ≥60KN/m2 |
Size | Non-standard, custom-made as per buy's request |
| Features | Easy to Handle |
| High Concrete Pouring Rate | |
| More Reuses | |
| Great Recyclable Value | |
| Environmental Friendly | |
| One-time Pouring |




1.Q-:Can I use this set of formwork to another project?
A.Yes, there are nearly 70% standard panels can be common reused.
2.Q-:What's your packing methods?
A.Protection foam+heat contracted plastic film. / wooden packing(non-fumigation)/ Metal pallet or depend on clients special requirement.
3.Q-:What's your payment terms?
A.T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C100%, or negotiate according to the order status.
4.Q-Are you manufacturer or trader?
A: GETO is the manufacturer of aluminum formwork system for 10 years. Our group as 4 factories, covering raged every scaffolding systems.
5.Q-:If I don't have construction crew knew well about your forwmork system, what can I do?
A.Well, we will send one or two field specialists to your construction site for guidance if you require.
6.Q-:Do you have pre-mocking up service?
A. Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently, then they do not need pre-mocking up, normally,we will do pre-mocking up to our customers
7.Q-:How to proceed an order for aluminum formwork?
A.1- Please provide completed project drawings to us.
2- GETO designer will work out formwork solution base on project drawings.
3- Construction details confirmed, sign sales contract and receiving deposit.
4- To work out shell drawings and modulation drawings.
5- Have meeting for confirming formwork model details
6- Production.
7- Acceptance and check.8- Shipping