Прямая продажа с завода, алюминиевые опалубки и бетонные формы для строительства коммерческого дома

Поделиться:


Цена:125,00 $ - 145,00 $
Стоимость в USD:Узнать цену

Количество:

Купить

Описание и отзывы


Характеристики




Product Description






If you ask me, what's the Most important thing in the world?


 


Developer and main contractor will tell you the Truth.


 


With the rapid development of economy, Time and Energy becomes particular important.


 


However, GETO Aluminium Formwork System save time and energy for you.


 


After that, you have more valuable time and energy to accompany with your family and friends.


 


Providing one-stop service, GETO Aluminium Formwork let you more assured and comfortable.


autoclaved aerated concrete wall panels


 autoclaved aerated concrete wall panelsautoclaved aerated concrete wall panels


 Aluminium Formwork Benefits









































ItemsAluminium formwork
1. MaterialAluminium alloy 6061-T6
2.Installation

After short period of training, workers can easily learn to install and dismantle the formwork.


3.Construction period3-5 days per storey.
4.Machine assistance

Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as:


1) Shifting of reinforcing steel rebar into assembly point


2) Removing debris from site


3) Loading and Unloading materials from trucks into site storage area.


5.Quality of formworkThe aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted.
6.Plastering costAs the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stabilityThe load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap valueThe scrap value is about 50% of the new panel.

 


autoclaved aerated concrete wall panels









Company Information




 autoclaved aerated concrete wall panels


 


autoclaved aerated concrete wall panels


 


 







Project site




 If clients require, GETO can provide field specilist to project site for guidance within one month without


 


charge, meanwhile, GETO will invite clients' site supervisor and workers to factory for learning and


 


training.


 


autoclaved aerated concrete wall panels







Construction Effect




 After dismantle aluminium formwork, it can control flatness and verticality 


 


in less than 5mm the wall surface is very smooth, one-time pouring


 


molding, without plastering and second work, saving construction time, energy as well as cost.


 


autoclaved aerated concrete wall panelsautoclaved aerated concrete wall panels







Our Services






 1: Your inquiry related to our product & price will be replied within 24hours.
2: Well-trained & experienced staff are to answer all your inquiries professional in English of course.
3: Working time: 8:00am - 18:30pm, Monday to Saturday.
4: OEM is highly welcomed. We have strong R&D team here to help.
5: Your business relationship with us will be confidential to any third party.
6: Good after-sale service offered, please get back if you got question. 


7. Mock up/pre-assemble in factory before delivery. Thus we can avoid some mistakes in advance and correct them.


autoclaved aerated concrete wall panels


 


 


 


  photobank (2)









Exihibition Show




 GETO takes each opportunity to expand business to the world, and bring our products and new technology, providing the best after-serve and create the biggest value and benefits to our clients. We attened oversea exhibition fair every year, in order to let more and more clients to save construction cost and do service for them.


 


autoclaved aerated concrete wall panels


 


 







Packaging & Shipping






PACKAGE:


Standard export carton packing.


DELIVERY TIME:


Within 5-20 days after confirming order,detail delivery date should be decided according to
different projects and order quantity.



autoclaved aerated concrete wall panels







FAQ






 


-Q-:Can I use this set of formwork to another project?


Yes, there are nearly 70% standard panels can be common reused.


-Q-:What's your packing methods?


Protection foam+heat contracted plastic film. / wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.


-Q-:What's your payment terms?


T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C  100%, or negotiate according to the order status


-Q-:Are you manufacturer or trader?


A: GETO is the manufacturer of aluminum formwork system for 9 years. Our group has 4 factories, cove raged every scaffolding systems.


-Q-:If I don't have construction crew knew well about your forwmork system, what can I do?


Well, we will send one or two field specialists to your construction site for guidance if you require.


-Q-: Do you have pre-mocking up service?


 Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently,


then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.


-Q-: How to proceed an order for aluminum formwork?


1- Please provide completed project drawings to us.


2- GETO design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.


3- Construction details confirmed, sign sales contract, receiving deposit.


4- To work out shell drawings and modulation drawings.


5- Have meeting for confirming model details.


6- Production.


7- Acceptance and check.


8- Shipping.


 


 How to contact us?





Send your inquiry details in the below for "free sample", click "Send" Now !!!

 

autoclaved aerated concrete wall panels





0.0057 s.