300 cubic meters HDG steel panel bolted sectional water tank for factory industrial water storage


Product Overview


Hot Dip Galvanized steel panels bolted assembled water tank
HDG water tank is assembled from hot dip galvanized steel panels. It is used for drinking water , fire fighting water and industrial water storage etc.
HDG steel: Hot Dip Galvanized steel.


FEATURES AT A GLANCE


1, Panels bolted assembled:
2, No rust:
3, No leakage;
4, Keep the water not be pollution,
5, Wide range of applications:
6, Long working life: at least 40 years.
7, Easy to install on site
8, Easy to maintain.



on the tower
on the roof
in the basement




PRODUCT SPECIFICATIONS


No
Item
Data
1
Tank  Volume  (CBM)
300
2
Tank  Size L*W*H (m)
10*10*3
9*9*4
8*8*5
3
Panel size: (mm)
1220*1220
2000*1000
1000*1000
1000*500
500*500
4
Panel thickness (mm)
2mm
3mm
4mm
5mm
5
Inlet/outlet/drainage
Customized
6
Vent/overflow
Customized
7
Manhole
D:600mm
8
Ladder
2pcs


PRODUCT CONFIGURATION


Hot Dip Galvanized steel panels
Quality Rubber sealant
Strong lacing bars


bolts/nuts
ladders
U-bar steel base



Qaulity Control:
* Selected High-quality raw materials:ISO standard Q235 steel carbon, bolts/nuts, rubber sealant etc, all be rigorously tested.
* All the FRP water tanks has passed the factory inspection before delivery.
* All the FRP water tanks enjoy 3 years warranty!




High strong bolt/nut
Steel basement of the tank for ensure the bottom is flat, and support the panels
Inspection center, for end quality control.


SALES AND SERVICE NETWORK




Packing and loading of the HDG steel water tank:
* packing volume < 10CBM, we will packing the plywood box for the parts of the water tank.
* packing volume 10-15 CBM, we will packing the steel frame box for the panels,
and plywood box for the other parts of the water tank.
* packing volume> 15CBM and above, we will loaded to the container directly.
* All in all, keep the water tank parts safety and save the transit cost at the same time
* We can according to your need to pack the parts of the water tank
according the destination port customs’ rules.


packed into plywood box
Loaded into the container directly


Successful Project


Project in kenya
Project in Saudi Arabia
Project in Russia


Water tank with insulation layer,
for the area where is <0 deg in Winter.
Water tank with outside reinforced bar.
for the water tank >4m height.
water tank painted with epoxy paint,
for underground buried tank


SIMILAR PRODUCTS


FRP water tank
SS304 bolted stainless steel water tank
SS304 weld stainless steel water tank


Company Introduction:
1) Professional and dedicated, we are serious about doing water
tank.
2) Strong capital, large stock of raw materials, so as to reduce costs to the maximum, and benefit customers.
3) Advanced equipment.
4) The production staff is highly skilled and experienced.
5) Sales staff are familiar with the market and export progress, make delivery fast, Ensure transportation safety and low cost.
6) Oversea service team available.
7) 24H after sales service.




Advabced Equipment
Experienced workers
Big stock, promised delivery in time


Installation:
Installation is very important for extend the working life of the water tank.


Concrete plitnh
It is basement of the water tank,
Very important for the water tank.
Specially for the big capacity water tank
Title goes here.
the U-bar steel base function:
1, Leveling.
2, support the bottom panel.
Bolted assembled
The connection is easy, just need bolted.
Skill: The screw up strength should be equal, don't have to push too hard.



Aftersales Service:
* Oversea service team available.
* We supply the installation direction in details, and installation video.
* On line video chat, direct installation.




Direct design the basement
Direct Installation on site
Training daily maintenance