1. After-sales service:
DARDONTECH will arrange engineer to customer’s factory for the machine installation and operate training. The online technical support will be served for the lifetime free of charge.
2. Documents
We will assist to provide most documents including Certificates; Insurance; Origin, and other export documents as required.
3. Delivery time
Please confirm the accurate delivery time with the sales manager. Normally 35-50 days.
4. Payment terms.
T/T, L/C, 100% should be paid before dispatch.
5. Warranty
Generally, 12months for the whole machines, except some tooling.
6. Shipping and Packing.
The packing standard is based on the the shipping types. Its seaworthy package or suit for rail transport.